Back to results
Trail network

Addison Oaks

Leonard, Michigan

A little about the riding

Oakland County says Addison Oaks in Leonard has a trail network of more than 20 miles that includes mountain biking. The page does not describe a lift.

Check admission

Find your kind of fun

Trail network

Outdoor

Surface
Not confirmed
For beginners
Beginner provision not confirmed
Getting uphill
Not confirmed
Admission
Check with operator

Trail network. The page says the park has a trail system of more than 20 miles for hiking, horseback riding, mountain biking, and winter fat-tire biking. A connector trail was not filed separately. The county office street was not stored. Hours were not stored. A line about all ages was not stored as a beginner area. The page does not describe a lift.

The practical things

ParkingNot confirmed
ToiletsNot confirmed
Bike rentalsAvailable
LessonsNot confirmed