Single-track Trails
Outdoor
- Surface
- Not confirmed
- For beginners
- Beginner provision not confirmed
- Getting uphill
- Not confirmed
- Admission
- Check with operator
Trail network. The county says phase one was completed in June 2021 and consists of about 6.2 miles of single-track trail, with a parking lot and bathroom at the trailhead. A later construction phase was not filed. The government center street was not used. The page does not say riders use a lift.