Trail network
Outdoor
- Surface
- Not confirmed
- For beginners
- Beginner provision not confirmed
- Getting uphill
- Not confirmed
- Admission
- Check with operator
Trail network. Named routes include the 4.5-mile Main Sage Hills Trail, the 2-mile Balsamroot Trail, and the Maiden Lane Connector. The page says the main trail crosses City of Wenatchee and PUD property. The page does not say riders use a lift.